12 Intermediaire II
FEI Intermediate II - Update 2022
Heidi De Keyser
Jebe van het Keysersbos
  H C Diff
1 A
X

XC
Enter in collected canter
Halt - immobility - salute
Proceed in collected trot
Collected trot
6 6.5 ±0.5
2 C
HXF
F
FA
Track to the left
Extended trot
Collected trot
Collected trot
6.5 7 ±0.5
3 A
DG


C
Down the centre line
3 half-passes, 5 m to either side
of the centre line, beginning and
ending to the right
Track to the right
2 6.5 7 ±0.5
4 Between R & B Transition to Passage 7 8 ±1
5 B(V) On the diagonal
Passage
6.5 7.5 ±1
6 Crossing
the center
line
Piaffe 8 to 10 steps
(1 m forward permitted)
5 6 ±1
7 In/out of
the piaffe
Transitions passage - piaffe - passage 6 7 ±1
8 From
piaffe
VKA
Passage 6 7.5 ±1.5
9 A Piaffe 8 to 10 steps
(1 m forward permitted)
6.5 6.5
10 A Transitions passage - piaffe - passage 6.5 7 ±0.5
11 AFP Passage 6 8 ±2
12 PS Extended walk 2 5.5 6 ±0.5
13 S
SHC
Collected walk
Collected walk
2 5 6 ±1
14 C
CM
Proceed in collected canter right
Collected canter
7 6.5 ±0.5
15 MXK
X
KAFP
Medium canter
Flying change of leg
Collected canter
7.5 7 ±0.5
16 PX
X
Half-pass to the left
Down the centre line
6.5 7 ±0.5
17 I
C
Pirouette to the left
Track to the left
2 5.5 7 ±1.5
18 HXF Extended canter 6.5 7 ±0.5
19 F

FAKV
Collected canter and flying change
of leg
Collected canter
6 7 ±1
20 VX
X
Half-pass to the right
Down the centre line
6.5 7 ±0.5
21 I
C
Pirouette to the right
Track to the right
2 6.5 7 ±0.5
22 MXK

KAF
On the diagonal 7 flying changes of
leg every 2nd stride
Collected canter
4 3 ±1
23 FXH

HC
On the diagonal 11 flying changes
of leg every stride
Collected canter
6.5 5 ±1.5
24 C
CM
Collected trot
Collected trot
6.5 6.5
25 MXK
K
KA
Extended trot
Collected trot
The collected trot
7 7
26 A
Between D&L
LI
Down the centre line
Transition to passage
Passage
6.5 7 ±0.5
27 I Halt - immobility - salute 7.5 7 ±0.5
Leave arena at A in walk on a long rein      
 
1 Riders position and seat; correctness and effect of the aids 2 6.5 7 ±0.5
 
1st error = 2 percentage points
2nd error = elimination
Other error - 0.5 percentage points
Other error - 0.5 percentage points
Other error - 0.5 percentage points